Today the cement for the main hall of the WaterFire Arts Center was poured! It took all day and dozens of laborers, but the floor is complete! Truck, after truck, after truck, brought loads of cement into the arts center parking lot, where it was pumped through the emergency doors and throughout the building! Beneath the floor is hundreds of feet of electrical conduit and access panels for the electrical system.
Building for the future is supported by TRAC Builders, LLC. To learn more about their contracting services, visit tracbuilders.com
About the author
Tim Blankenship, newly appointed Director of Special Projects, is a 22-year veteran of WaterFire and a steadfast advocate for the organization’s mission to unite the community through shared artistic experiences. Having worked across multiple departments, including a decade in production and recent years with the creative services team, Tim brings unmatched institutional knowledge to his new role. He will focus on strengthening internal systems and supporting the creation of new visitor experiences at both the downtown installation and the WaterFire Arts Center.
- Tim Blankenship
- Tim Blankenship
- Tim Blankenship
- Tim Blankenship
- Tim Blankenship
- Tim Blankenship
- Tim Blankenship
- Tim Blankenship
- Tim Blankenship
- Tim Blankenship
- Tim Blankenship
- Tim Blankenship
- Tim Blankenship
- Tim Blankenship
- Tim Blankenship
- Tim Blankenship
- Tim Blankenship
- Tim Blankenship
- Tim Blankenship
- Tim Blankenship
- Tim Blankenship
- Tim Blankenship
- Tim Blankenship
- Tim Blankenship
- Tim Blankenship
- Tim Blankenship
- Tim Blankenship
- Tim Blankenship
- Tim Blankenship
- Tim Blankenship
- Tim BlankenshipSeptember 11, 2013
- Tim Blankenship




























































































































































































































