Building for the Future Episode 11 | Installing a Second Floor
Donald Hawes from RI Welding was kind enough to speak to us about the installation process used to create the second floor in The WaterFire Arts Center. Donald installed hanging columns from the existing beams and used existing columns as well to create a platform for the new floor. All of these… Read More »Building for the Future Episode 11 | Installing a Second Floor