Skip to content

Building for the Future Episode 22 | Three Dimensional Modeling

Providence local DBVW Architects used three-dimensional computer models to help them design the WaterFire Arts Center. By relying on laser scans of the preexisting building to generate a super accurate and detailed model, interventions and modifications were laid out in an explorable, modifiable environment that eased coordination between ourselves, DBVW, and the engineers and contractors involved.

To learn more about DBVW and their architectural services, visit www.dbvw.com.

Building for the future is supported by TRAC Builders, LLC. To learn more about their contracting services, visit www.tracbuilders.com

About the author

Tim Blankenship
Director of Special Projects at  | + posts by author

Tim Blankenship, newly appointed Director of Special Projects, is a 22-year veteran of WaterFire and a steadfast advocate for the organization’s mission to unite the community through shared artistic experiences. Having worked across multiple departments, including a decade in production and recent years with the creative services team, Tim brings unmatched institutional knowledge to his new role. He will focus on strengthening internal systems and supporting the creation of new visitor experiences at both the downtown installation and the WaterFire Arts Center.

Leave a Reply

Your email address will not be published. Required fields are marked *