Skip to content

Building for the Future Episode 16 | Sky Bridge Concrete Pour and Window Install

One of The WaterFire Arts Center’s defining characteristics is the elevated sky bridge spanning the width of the building. It has just received its new concrete floor, and in a few days, we will be using it to access our space! The west facing wall has received nearly all of its windows, and in this video, you can see up close how they are secured into their frames.

Building for the Future is supported by TRAC Builders Inc.
Learn more about TRAC by visiting TRACbuilders.com

About the author

+ posts by author

I've worked at WaterFire Providence since 2003. For the first 9 years of my career, I worked in the Production Shop learning all of the details that go into the physical production of the event. In 2012 transitioned to the role of managing WaterFire's social media and web presence. I now head up WaterFire Providence's digital projects including, web, social, databases, and our physical IT infrastructure.

Leave a Reply

Your email address will not be published. Required fields are marked *